My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:35:47 PM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> Site Investigation Work Plan <br /> Nella Oil Station #21 , 40052 Highway 41 , Oakhurst, California <br /> Upon completion of the field sampling activities , the samples will be immediately transported to Ir <br /> Torrent Air Toxics, LTD . (CA NELAP - 0211 OCA) in Folsom , California, for analysis of the TPH- iV �l <br /> G , BTEX, MtBE , DIPE , EtBE , TAME , TBA, and 1 ,2-DCA by EPA Method TO-15 and TPH-D by A� ' P}+V j <br /> EPA Method TO- 17. <br /> 3.4 Scheduling and Reporting <br /> Upon approval of this work plan , WRM will schedule the soil vapor sampling . Based on <br /> historical data and the results of the soil vapor survey and sensitive receptor survey, WRM will <br /> prepare a Corrective Action Plan (CAP) which will evaluate two to three alternative methods for <br /> site remediation . Because the results of the soil vapor survey are integral to preparation of a <br /> complete Human Health Risk Assessment (HHRA) as it assesses the important vapor intrusion <br /> pathway, WRM recommends that the HHRA be included as a section in the CAP . <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.