Laserfiche WebLink
f <br /> ENVIR® NEERING , INC . ` <br /> `r Process Engineering, Water Reuse, and Accident Prevention <br /> March 1 , 2007 <br /> Ms. V. L. McCartney <br /> Environmental Health Department <br /> 304 Weber Avenue, Third Floor <br /> Stockton, CA 95202-2708 <br /> Dear Ms. McCartney: <br /> Re: California Tank Lines — Work Plan Addendum <br /> This responds to the Environmental Health Department' s letter dated January 24, <br /> 2007, regarding the Work Plan Addendum dated December 15 , 2006, for the site <br /> at 3105 S . El Dorado Street, Stockton, CA. <br /> We have reviewed the drilling, sampling and analysis program again and now <br /> believe that all objectives can be met without sampling and analyzing <br /> groundwater from MW-4 as proposed. Accordingly, we are deleting this <br /> requirement from the program proposed in the referenced Work Plan Addendum. <br /> Please advise if this is acceptable to the Department. If so, we will proceed to <br /> complete the remaining work items. <br /> Thank you for your guidance in developing this program. <br /> i <br /> Sincerely, <br /> G. W. Roy, P.E. <br /> c.c. Mr. J. Bishop <br /> I <br /> i <br /> i , <br /> I <br />`� , _ P. 0. Box 2498, Danville, CA 94526 • (925) 838-1763 Fax (925) 8384621 <br />