Laserfiche WebLink
Page I of 2 <br /> lowVW <br /> Vicki McCartney [EH] <br /> From: AD [ad@DESxyz.com] <br /> Sent: Sunday, September 07, 2014 6:36 PM <br /> To: Vicki McCartney [EH] <br /> Cc: Allen Genetti; Greg Delson <br /> Subject: Fwd: Caltank Mtg Agenda <br /> Hi Vicki, <br /> We are flying to Stockton tomorrow for our meeting, which I understand was at 1 pm. <br /> The below agenda is cover the highlights of the 1 Q-2014 Report update. <br /> We are available to listen to your feedback. <br /> We hope to enable the remaining elements to complete the investigation and move forward with a <br /> cleanup program. <br /> I am available by cell# (760) 477-3007 during travel to your office. <br /> Best Regards, <br /> DONAN ENVIRONMENTAL SERVICES, INC. <br /> Andy Donan <br /> General Manager <br /> Begin forwarded message: <br /> From: AD <ad _desxyz.com> <br /> Date: September 7, 2014 5:49:36 PM PDT <br /> To: Greg <gd[@DESxyz.com> <br /> Subject: Caltank Mtg Agenda <br /> Greg, <br /> Proposed Agenda is to summarize the key points of Q 1-2014 Report with the San Joaquin <br /> County EHD (Vicki and Nuel) such for feedback and concurrence on the investigation <br /> concept and moving forward to a cleanup strategy. <br /> 1) The Q 1-2014 Report updated the Site's groundwater enigma(Fig 3)by using the <br /> combined groundwater data(Fig 4) with the adjacent site <br /> for a combined flow over a wider area with more wells (Fig 5). <br /> 2) The updated Groundwater plan then enabled a reference basis with the Adjacent Site to <br /> narrow the previously historical wide variation in the Site's groundwater to a more typical <br /> seasonal hydraulic cycle and consistent with the Adjacent Site's groundwater flow. (Fig 5 <br /> to Fig 11). The most recent groundwater plan (Fig 5- Q1-2014) shows an added dynamic <br /> due to the Adjacent Site's dewatering. <br /> 3) Co-GW monitoring was recommended and accepted for the more accurate mutual <br /> benefit of both Site parties and our common Agency leadership. <br /> 4Q-2014 is the start of the co-monitoring events. <br /> 9/8/2014 <br />