Laserfiche WebLink
Page 9 of 9 <br /> **.. Nwo� <br /> extent of the product, which <br /> is the significant control gap <br /> to complete the investigation <br /> and to move forward to <br /> cleanup. <br /> 7) The minimum of two <br /> proposed monitoring wells <br /> DW6 and DW7 were <br /> proposed for real time <br /> current migration of the <br /> product instead of relying on <br /> out dated historical data. <br /> Concurrence from EHD. <br /> 8)A proposed strategy to <br /> cleanup was presented in the <br /> 1 Q-2014 Report. <br /> Concurrence from the EHD. <br /> Other point sand details can <br /> be expounded upon in the <br /> meeting such that our <br /> colleagues concur, and <br /> meaningful progress can <br /> result to benefit Allen <br /> Genetti's long awaited case <br /> closure. <br /> Please confirm. <br /> Andy <br /> <WELL BORING PERMIT 14.pdf><MFR.pdf> <br /> Greg <br /> gd(213ESxyz.com <br /> Greg <br /> gd@DESxyz.com <br /> 11/10/2014 <br />