My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
BILLING PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2023 4:29:40 PM
Creation date
7/25/2019 9:26:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�SpURCF3 <br /> • STATE OF CALIFORNIA r' cO>^ <br /> 1 STATE WATER RESOURCES CONTROL BOARD 3�_ ,mr: <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �� j ua <br /> COMPLETE A SEPARATE FORM FO CH TANK SYSTEM. <br /> MARK ONLY 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSE <br /> ONE ITEM 2 INTERIM PERMIT 0 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: - <br /> �� <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> k <br /> . OWNER'S TANK I.D.# B. MANUFACTURED BY:. DATE INST LED(MO/DAY/YEAR) 0. TANK CAPACITY IN GALLONS: <br /> i II.TANK NTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL S. C ❑ 1a REGULAR 3 DIESEL ❑ 6 AVIATION GAS <br /> A UNLEADED 4 GASAHOL <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY Vl PRODUCT ❑ lbtPRE PREMIUM ❑ 5 JET FUEL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 0 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTR TION MARK ONE ITEM ONLY IN BOXES A.B.AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ !/OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS EV4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 ALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ ALKYD LINING ❑ 3 EPDXY LINING F--] 4 PHENOLIC LINING <br /> C.INTERIOR E:] 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 THEIR <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES NO <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION 0 5 CATHODIC PROTECTION ❑ 91 NONE 0 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR):gzeEOVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUNgDB GROUNDU IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U PRESSUR A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A(U)2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A 0FIBERGLASS PIPE <br /> CORROSION A U ALUMINUM A U B CONCRETE A U 7 STEEL W/COATING A U B 100°/ METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODICPROTEC ON A U 95 UNKNOW A U 99 OTHER_ <br /> D. LEAK DETECTION M 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING 3 INTERSTITIAL <br /> MONIT ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 1-1/ INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING DZ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> YES ❑ NO ❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED&SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OFTHE FOUR NUMBERS BELOW <br /> �111f <br /> STATE COUNTY# JURISDICTION# FACILITY# TANK# <br /> I.D.# LlA �(0 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> ORO R5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.