My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO 1986 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 11:45:02 AM
Creation date
7/25/2019 11:10:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2004
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTHSERVICES oP <br />SAN JOAQUIN COUNTY z. z <br />JOGI KHANNA M.D., M.P.H. �.. ` <br />Health Officer <br />P <br />P.O. Box 2009 . (1601 Fast Hazelton Avenue) • Stockton, California 05201 �FgHIrk <br />(209)468-3400 <br />Facility Name VIr'wc <br />Address 1 <br />Date of Inspection -3-6:wInspector alp, <br />MONITORING ALTERNATIVE #5 <br />Annual precision test on tank(s) and piping. <br />Daily inventory reconciliation with submission of quarterly <br />statement regarding compliance with allowable variation. <br />Pipeline leak detectors on pressurized piping. <br />Daily operational check of suction piping function. <br />Calibb ted meters for inputs and withdrawals: <br />✓ Weights and Measures sticker <br />Certification by qualified repairman <br />Implementation of this monitoring alternative requires that the following <br />CIRCLED items be completed by the specified dates. <br />1. Precision test(s) must be performed and results <br />submitted to this office within 30 days of the test. <br />2. Pipeline leak detectors must be installed on pressurized piping by <br />& rhyt_a . <br />3. Daily inventory reconciliation must be started immediately, with <br />records maintained'at the facility for review. <br />4. Document daily check of suction piping function starting <br />immediately. <br />5. Submit quarterly statement to this office that allowable variation <br />on inventory reconciliation has not been exceeded or a list of <br />dates and variations that exceeded allowable. *The first statement <br />is due by �4 -I S c D <br />6. Dispenser meter(s) must be calibrated by �-Sf'J() with a copy of <br />certification or Weights and Measures sticker number submitted to <br />this office. <br />If the above compliance dates cannot be met, contact this office prior to <br />the specified date. <br />* If allowable daily inventory variation is exceeded, refer to Section <br />2644(f) for required actions. <br />EH 23 001 4/89 <br />A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.