My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO 1986 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 11:45:02 AM
Creation date
7/25/2019 11:10:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2004
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name U► 1 Ac. f �Ot:TC i Yn Y9c21 -11-1 <br /> Facility Address )---w aralZo&� S lek '' <br /> A. Describe the frequency of performing the monitoring: <br /> Tank �0LAI Lto0L � <br /> Piping [I t' LYI 11 UQ t`t <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the onitoring: <br /> Tank <br /> 41 Ki"0 <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should b attached): <br /> D. List the name(s) and titles) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> `0 2 d r2" <br /> E. Reporting form or monitoring: <br /> Tank L£,G �— <br /> Pipin In 6 &n �F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordan a with the manufacturers' maintenance schedule <br /> but not less than every 12 months: --7Xl r? �� h;Q h n u ►4 <br /> S.n n +Ln7-1- <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: f i ( , ;2�-�r j " I r C, <br /> i� dA(2-9 Z2 vtn Wd'--2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.