My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 10:46:31 AM
Creation date
7/29/2019 10:40:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'i San JoagWn County <br /> Environmental Health Department DIRECTOR <br /> }. '_, ' ' •.o Donna Heran, REHS <br /> a p Nit 600 East Main Street <br /> v. -'�' <br /> Stockton , California 952023029 <br /> PROGRAM COORDINATORS <br /> U% �� Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> • :. . ,:p > Kasey Foley, REHS <br /> 9 � rFo'R�� Website: www.Sigov. org/ehd Linda Turkatte, REHS <br /> Phone: (209) 468-3420 <br /> Fax: (209) 464=0138 <br /> June 28, 2011 <br /> Mr. David Atwater <br /> I Van De Pol Enterprises, Incorporated <br /> Post Office Box 1107 <br /> Stockton, California 95201 <br /> Subject: Pacific Pride - South EI Dorado Street <br /> 3147 South EI Dorado Street <br /> Stockton, CA 95206 <br /> Dear Mr. Atwater: <br /> The San Joaquin County Environmental Health Department (EHD) has received and reviewed <br /> Dual Phase Extraction Pilot Test Report - February 2011 (report), dated 13 May 2011 , <br /> prepared by your consulting firm, Advanced GeoEnvironmental, Inc. (AGE), on your behalf for <br /> the above-referenced site. In the report, AGE documents the results from a 24-hour dual <br /> phase extraction (DPE) pilot test involving the simultaneous extraction of groundwater and soil <br /> vapor from monitoring well MW-7 located approximately 31 feet down-gradient of the former <br /> underground storage tank area . AGE describes how soil vapor and groundwater samples <br /> were collected and analyzed for chemicals of concern at designated times throughout the pilot <br /> test. note that high concentrations of TPH-g and TPH-d were detected in soil samples <br /> collected from P- 1 at 20 feet below surface grade (bsg) and high soil gas concentrations were <br /> detected in P-7 . <br /> AGE induced and sustained a cone of groundwater depression of 38.5 feet below surface <br /> grade (bsg) at MW-7, noting that the static water level measured from MW-7 prior to the DPE <br /> test was approximately 24 bsg . AGE monitored wells MWA , MW-2, MW-4, MW-6, and VW-1 <br /> through-VW_-3-for induced-groundwater_draw-down levels-while extracting groundwater fmrr <br /> MW-7 at a rate of approximately 1 .8 gallons per minute; the maximum induced groundwater <br /> drawn-down was 0.32 feet measured from MW-1 . A total of 2,592 gallons of water were <br /> extracted between 01 and 02 February 2011 , and approximately 0. 1 pounds (equivalent to <br /> 0.012 gallons) of total petroleum hydrocarbons as gasoline (TPH-g) were removed over the <br /> 24-hour period . <br /> Once the water level was sustained at 38.5 feet bsg in MW-7, AGE induced a vacuum in the <br /> vadose zone and monitored VWA through VW-3 and MW-4. The greatest induced vacuum <br /> measurement was 0.23 inches of water measured from VW-2 located 32 feet from extraction <br /> well MW-7. The effective radius of influence was projected to be approximately 53 feet at a <br /> vacuum potential of 0 . 1 inches of water. AGE calculated the mass and volume of soil vapor <br /> hydrocarbons extracted during the DPE pilot test to be approximately 15. 1 pounds of gasoline <br /> (equivalent to 2.4 gallons of gasoline). <br />
The URL can be used to link to this page
Your browser does not support the video tag.