My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 10:46:31 AM
Creation date
7/29/2019 10:40:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Assessment & SVE Feasibility Testing Work Plan - June 2008 <br /> PACIFIC PRIDE - SOUTH EL DORADO <br /> 3147 South El Dorado Street, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2. 1 . PERMITTING AND PRE-FIELD WORK ACTIVITIES . . . . . . . . . . . . . . . . . . . 2 <br /> 2.2 . WELL DRILLING AND SOIL SAMPLE COLLECTION . . . . . . . . . . . . . . . . . . 2 <br /> 2. 3 , INSTALLATION OF REMEDIATION WELLS . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 2.4 , SVE PILOT TESTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 2050 REPORT PREPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3 . 1 . DRILLING . . . . . . . . . . . . . . . . . . . . . . . . . . . '. . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3 .2 . SOIL SAMPLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3 . 3 . GROUND WATER MONITORING WELL COMPLETION . . . . . . . . . 0 1 1 1 . . 5 <br /> 3 .4. SOIL VAPOR EXTRACTION WELL COMPLETION 1 0 0 4 . . . . . . . . . . . . . . . . 6 <br /> 3 . 5 , SOIL VAPOR EXTRACTION PILOT TEST . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> FIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 Is Lateral Extent ofAbsorbed TPH-G Concentrations in Vadose Zone <br /> Figure 4 - Extent of First Zone Dissolved TPH-g <br /> Figure 5 - Hydrocarbon Impacted Soil Plume Cross Section E-E ' <br /> Figure 6 - Hydrocarbon Impacted Soil Plume Cross Section F-F ' <br /> Figure 7 - Proposed Ground Water Monitoring Well Construction Design <br /> Figure 8 - Proposed Soil Vapor Extraction Well Construction Design <br /> Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.