01 July 2008 <br /> AGE-NC Project No . 97-0301 <br /> Page 6 of 8 <br /> Following placement of the filter pack, the well will be surged utilizing a 24nch well surge block <br /> to assist in settling the filter pack. Additional sand will be added if settling occurs. <br /> A three-foot bentonite seal (bentonite chips) will be placed above the filter pack to minimize the <br /> potential for grout penetration into the screened section of the well. The bentonite seal will be <br /> formed by either pouring bentonite chips into the annulus and allowing them to settle on the filter <br /> pack or by using coated bentonite pellets. Bentonite chips or pellets will be hydrated using a <br /> minimum of five gallons of tap water. The bentonite chips will be allowed to hydrate for a minimum <br /> of one-half hour prior to grouting. <br /> The remaining annular space will be filled to the ground surface with a cement grout. The grout <br /> mixture will consist of Type 1/11 portland neat cement and not more than 6 gallons of water per <br /> 94-pound sack of cement. The grout will be placed by pumping through tremie pipe. A grouting <br /> inspection will be scheduled with SJCEHD personnel. The proposed ground water well construction <br /> diagram is depicted in Figure 7. <br /> Upon grout completion, an eight-inch diameter, flush mount, traffic rated, steel well box will be <br /> installed over the well casings and secured with a bolted, steel well box cover. <br /> A reference point will be marked on the top of each well head, and surveyed by a California licensed <br /> surveying engineer to the nearest 0.01 foot to determine the elevation relative to a surveyed <br /> benchmark and to determine GPS coordinates for tracking on the State Water Resources Control <br /> Board (SWRCB) GeoTracker database system. <br /> Following installation of well MW- 13, but not less than 48 hours, well development activities will <br /> be performed at well MW- 13 . Well development will consist of a combination of bailing to remove <br /> the major portion of fine-grained sediment from inside the well, surging to flush out or draw in <br /> sediment from the filter pack, and additional bailing to finish the removal of sediment. Development <br /> activities will be continued until field parameter (pH, electrical conductivity, and temperature) <br /> readings have stabilized. <br /> 3 .4. SOIL VAPOR EXTRACTION WELL COMPLETION <br /> Each SVE well will be completed as a single-casing soil vapor extraction well utilizing 4-inch <br /> diameter schedule 40 polyvinylchloride (PVC) 0.030-inch slotted well screen and blank well casing. / <br /> Based on geologic conditions, a 20-foot length of well screen from 10 to 30 feet bsg is anticipated <br /> for installation of each SVE wells; a diagram for the proposed construction of SVE wells VW- 1 , <br /> VW-2 and VW-3 is depicted in Figure 8 . <br /> Advanced GeoEnvironmental, Inc. <br />