My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009112
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
ARCHIVED REPORTS XR0009112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 11:01:57 AM
Creation date
7/29/2019 10:44:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009112
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1 <br /> 24 August 2005 <br /> • AGE-NC Project No. 97-0301 <br /> ' Page 6 of 6 <br /> t5.0. RECOMMENDATIONS <br /> Based upon data collected during the 2nd Quarter 2005, AGE recommends: <br /> • Continued groundwater monitoring utilizing wells MW-1 through MW-12;the third quarter <br /> 2005 ground water monitoring event is scheduled for September 2005. <br /> ' • If applicable,conduct future ground water monitoring events concurrently with the Cal-Tank <br /> Lines site (3105 South El Dorado Street). <br /> •' Continued quarterly depth-to-water measurements in all monitoring wells at the site, but 16'tk p r <br /> reduced ground water sampling frequency at wells MW-2, MW-3 and MW-6 from a <br /> quarterly to an annual program; AGE believes that continued quarterly ground water J <br /> sampling from these wells at this stage of the investigation is not cost effective and will <br /> ' provide minimal information to supplement the ongoing investigation. Annual sampling a 04 ) <br /> events should be adequate to monitor ground water impact at these wells and should be re- rp <br /> ' evaluated on an annual basis. <br /> • Elimination of TPH-d, TPH-k and TPH-mo from the site's ground water monitoring l��00's <br /> program. (k011r 6� <br /> Installation of additional monitoring wells southeast-beyond well MW-9A and northeast <br /> • t <br /> beyond well MW-l0A to define the First Water Zone dissolved 1,2-DCA plume. � <br /> G 4Ars( �� - ';SIA <br /> 6.0. LIMITATIONS o� 3Yn <br /> Y � <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> ' environmental consultants practicing in this or similar localities. The findings were based upon <br /> analytical results provided by an independent laboratory.Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from review of previous consultants reports <br /> ' and a limited number of available data points(ground water data/samples)and subsurface conditions <br /> may vary away from these data points. No other warranty, expressed or implied, is made as to the <br /> professional interpretations, opinions, and recommendations contained in.this report. <br /> � I <br /> 1 . <br /> � ' Advanced GeoEnvironmcntal,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.