Laserfiche WebLink
25 January 2005 I� <br /> • AGE-NC Project No 97-0301 <br /> ' Page 6 of 6 <br /> sampling from these wells at this stage of the investigation is not cost effective and will not <br /> ' provide enough useful information to supplement the ongoing investigation Annual <br /> sampling events should be adequate to monitor ground water impact at these wells and <br /> should be re-evaluated on an annual basis <br /> ' <br /> • Elimination of TPH-d, TPH-k and TPH-mo from the site's ground water monitoring <br /> program <br /> • No additional ground water monitoring wells/soil borings are warranted at this time and the <br /> existing monitoring well network maybe sufficient to complete a site Corrective Action Plan <br /> i ' (CAP) and/or Problem Assessment Report (PAR) <br /> r <br /> I ' 6.0, LIMITATIONS <br /> ' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologrc conditions <br /> ' at the site for the purpose of this investigation was made from review of previous consultants reports <br /> and a limited number of available data points(ground water data/samples)and subsurface conditions <br /> may vary away from these data points No other warranty, expressed or implied, is made as to the <br /> professional Interpretations, opinions, and recommendations contained in this report <br /> I 1 <br /> 1 <br /> 1 <br /> ' Advanced GeoEnvironmental,Inc <br /> I <br />