Laserfiche WebLink
Corrective Actions <br /> Violation 103 : HMBP was updated on CERS on 08/28/2019 as required. (Copy attached) <br /> Violation 110: Corrected on CERS as advised. <br /> Violation 301:The SPCC Plan has been corrected (Please see attached file) <br /> Violation 601: As mentioned above, the Spill Prevention, control, and countermeasure Plan (SPCC) <br /> amended as required.Also in future we will do better job on this. <br /> Violation 609: We apologize for the mistake and going forward we will make sure that it will not happen <br /> again.Amended SPCC Plan includes updated emergency contacts <br /> Violation 620: Designated person accountable for spill prevention has been updated and included in <br /> SPCC Plan. <br /> Violation 711: We have conversation with our service provider Afforda Test and Elite 4 to schedule all <br /> required testing and inspections and submit the testing reports in a timely manner to EHD. <br /> Violation 715: Corrected on SPCC Plan <br />