Laserfiche WebLink
1 <br /> }" <br /> GEO PHASE <br /> -- ENVIROJNMENTAL <br /> July 9 2010 <br /> 1 <br /> GPE Project No.:102.3 <br /> Mr. Reed Rosenberg <br /> Bank of Stockton <br /> PO Box 1110 <br /> I; Stockton, CA 95201 <br /> Re: Report: Quarterly Groundwater Monitoring, Second Quarter 2010 <br /> Cutter Lumber Site/Western Lift (USTCFP Claim No. 01878) <br /> CWRCB GID Code T0607700498 <br /> 3930 S. El Dorado, Stockton, CA <br /> Dear Mr. Rosenberg: <br /> Pursuant to a regulatory directive, no groundwater sampling was conducted <br /> at the subject site during this quarter. <br /> The SVE/AS remedial system was operated during much of the quarter, and <br /> monitoring data sheets are herein attached. It was shut down on the April <br /> 5th, a few days earlier than planned, due to mechanical failure of the <br /> regenerative blower, which is used for vapor extraction. The blower was <br /> replaced and the system restarted on schedule on May 5th. The system ran <br /> normally for the next month and was again shut down on June 8th for re- <br /> equilibration. <br /> Respectfully Submitted, <br /> Geo-Phase En ironmental Inc. <br /> Stephen M. Lankford, PG/REA <br /> CC: San Joaquin County EHD <br /> Attachment <br /> 'I <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. (209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br /> I <br />