Laserfiche WebLink
,rl <br /> GEO-PHASE <br /> ENVIRONMENTAL <br /> 1 <br /> WORK PLAN <br /> (Revised) <br /> Groundwater Monitoring Well Installation <br /> i <br /> Cutter Lumber-Former Union Oil Tank Site <br /> 3430 &3422 S. E1 Dorado <br /> Stockton, California <br /> i <br /> December 19, 1997 <br /> Project No. 102.2 ENVIRONMENTAL HEALTH DIVISION <br /> 304 E. Weber Ave.Third Floor - <br /> P. O. Box 388, Stockton CA 95201-0388 <br /> Approved <br /> Denied <br /> Conditions At, <br /> 5w 2G& U w... <br /> Date 12(, by Ll{C <br /> Prepared for: <br /> Mr.'Pat O'Rourke <br /> Bank of Stockton <br /> Post Office Box 1110 <br /> Stockton, CA 95201. j <br /> I <br /> Submitted by: <br /> Geo-Phase Envirorunental Inc: <br /> 2937 Veneman Ave., Suite B240 <br /> Modesto, CA 95356 <br />__ 2937 Veneman Ave.,#13240 Geo-Phase Environmental Inc. Phone(209) 569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br /> 1 <br /> 7 777 <br />