Laserfiche WebLink
PHASE ONE <br /> ENVIRONMENTAL <br /> Client Name: Bank of Stockton <br /> Address: <br /> Site Name: Cutter Lumber <br /> Address: 3922 S.El Dorado <br /> Stickton,CA <br /> Signature: r <br /> Printed Name: Stephen M.Lanklordy A <br /> DESCRIPTION UNIT iUNITSCOST/UNIT TOTAL <br /> i <br /> I <br /> PROJECT PREPARATION <br /> Project Planning HOURS 4 $70 $280 <br /> Work Plan Preparation HOURS 5 $70 $350 <br /> Well/Borehole Drilling Permit PERMIT 1 $240 $240 <br /> ESTIMATED TOTAL-PROJECT PREPARATION $870 <br /> BOREHOLE DRILLING 8 LOGGING <br /> Hollow Stem Auger Borings to 35' FEET 280 $16 $4450 <br /> Log 8 Sample Borings _ HOURS 15.0 $79 $1.180 <br /> ESTIMATED TOTAL DRILLING,LOGGING 8 SAMPLING $5,630 <br /> ABANDON DOMESTIC WELL <br /> Plug Well 8 Cut off Csg. EVENT 1 $719.00 $719 <br /> Supervision HOURS 2 $70.00 $140 <br /> TOTAL ESTIMATED WELL ABANDONMENT $859 <br /> LABORATORY ANALYSES(24 Soil) <br /> TEPH.TPH.&STEX SAMPLE 24 $75.00 $1,800 <br /> INTERRIM SITE WORK <br /> SOIL CUTTINGS DISPOSAL DRUMS 12 $62, $980 <br /> DATAANAYLSIS&REPORTING <br /> SITE CHARACTERIZATION REPORT HOURS 18 $70 $1.260 <br /> ESTIMATED TOTAL PROJECT COST $11.399 <br /> COST ALLOCATED TO UST INVESTIGATION $9,119 <br /> 11/20/96 2:21 PM PAGE 1 <br />