My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
SITE INFORMATION AND CORRESPONDENCE CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 11:51:33 AM
Creation date
7/30/2019 11:41:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FED-10-1997 09-28 UST CLEANUP FUND 916 227 4530 P.02/03 <br /> V U <br /> Mr.John Umytia 2 <br /> k <br /> utting disposal $844 <br /> r well abandonment $860 <br /> AL PW APPROVED $9,954 <br /> • I want to reiterate that costs related to sources other than the underground storage <br /> tis are not eligible for reimbursement. At this point there is insufficient <br /> information in the file to determine what percentage, if any, of the costs are related <br /> to in UST sources. These costs will be evaluated for eligibility once they are <br /> submitted for reimbursement. <br /> • I was unable to locate the County's approval letter, dated.approximately October <br /> 17, 1996_ Please submit a copy of the County's approval letter when these costs <br /> are submitted for reimbursement. <br /> • The actual costs and scope of work perfbr med must be consistent with this pre- <br /> approval for it to remain valid. <br /> o The work products must be acceptable to the County and the Regional Water <br /> Quality Control Board, <br /> • It is my opinion that it is unnecessary to obtain three bids for this scope of work; <br /> the Fund's three bid requirement is waived for this scope of work_ <br /> * If a different scope of work becomes necessary,then you must request pre- <br /> approval of costs for the new scope of work <br /> Although I have referred to the Phase One Environmental proposal in my pre- <br /> approval above,please be aware that you will be entering into a private contract: <br /> the State of California carmot compel you to sign any specific contract. This letter <br /> pre-approves the costs as presented by Phase One Environmental for conducting <br /> the work approved by the County for implementing the Phase One Environmental <br /> workplan_ <br /> I also avant to renind you that the Fund's regulations require that you obtain at least three <br /> bads, or a bid waiver from Fund staff;from qualified films for all necessary corrective <br /> action work. The legislation,governing the Fund requires that the Fund assist you in <br /> procuring contractor and consultant services for co=ctive action. I£you need any <br /> assistance in contracting for corrective action services, don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual cost of the work as explained <br /> in the xieimbursement.&4mest Instut 'ens to confirm that the costs are consistent with <br /> O Recycta d Fapsr Oyr»demon is to pr&w and mhams the quality ofCaWornia's wow r¢aounw,and <br /> emr m MarpropwagmaffoA and efident urs far the bem It ofp onnt aptd fer&ria gemuu&=,L <br />
The URL can be used to link to this page
Your browser does not support the video tag.