Laserfiche WebLink
w <br /> GEO-PHASE <br /> ENVIRONMENTAL <br /> January 25, 2011 RECEIVED <br /> GPE Project No.:102.3 <br /> J .IAN 2 8 2011 <br /> ENVIRONMENTAL HEALTH <br /> Mr. Reed Rosenberg PERMIT/SERVICES <br /> Bank of Stockton <br /> PO Box 1110 <br /> Stockton, CA 95201 <br /> - `- - -Re: '-Repbrt:`Quarterly Groundw'aateer Monitoring, Fourth:Quartei2010 <br /> Cutter Lumber Site/Western Lift (USTCFP Claim No. 01878) <br /> CWRCB GID Code T0607700498 <br /> 3930 S. EI Dorado, Stockton, CA <br /> Dear Mr. Rosenberg: <br /> Pursuant to a regulatory directive, no groundwater sampling was conducted <br /> at the subject site during this quarter. <br /> The SVE/AS remedial system was operated during much of the quarter, and <br /> monitoring data sheets are herein attached. It was shut down normally <br /> October 5th, for a planned period of subsurface re-equilibration. After the 30 <br /> day down cycle, the system was restarted on November 5th. The system was <br /> again shut down on December 5th for another planned period of re- <br /> equilibration. <br /> Respectfully Submitted, <br /> Geo-Phase Environmental Inc. <br /> Stephen M. Lankford, PG/REA <br /> CC: San Joaquin County EHD <br /> I <br /> Attachment j <br /> 2937 Veneman Ave..#B240 Geo-Phase Environmental Inc. (209)569-0293 <br /> Modesto.CA 95356 Fax(209)569-0295 <br /> I <br />