Laserfiche WebLink
i <br /> so <br /> GEI- <br /> O-PHASE <br /> ENVIRONMENTAL <br /> C C,E W E 0 <br /> February 18, 2010 FEB 2 2 2010 <br /> Mr.Tom Altwies ENVIRONMENT HEALTH <br /> Manna Pro Corporation PERMIT%SERVICES <br /> 707 Spirit 40 Park Drive, Suite.150 <br /> St. Louis, Missouri 63005 <br /> RE: Fourth Quarter 2009 Monitoring Report <br /> Former Manna Pro Site <br /> 4004 S. El Dorado Street, Stockton, CA <br /> Dear Mr. Altweis; <br /> Pursuant to a recent regulatory directive, no groundwater sampling was <br /> conducted at the subject site during this quarter, <br /> The SVE/AS remedial system was operated during much of the quarter, and <br /> monitoring data sheets are herein attached. It was shut down on the 9th of <br /> October for scheduled subsurface re-equilibration and restarted on the 9th of <br /> November. It ran for the remainder of November and was once again shut <br /> when one of two 4-inch exhaust hoses failed. The system was then shut down <br /> one week prior to a scheduled re-equilibration shutdown. The failed exhaust <br /> hose has since been replaced. <br /> Respectfully Submitted, <br /> Geo-Phase Envi nmental Inc. <br /> Stephen M. Lankford, PG/REA <br /> Attachment <br /> 2937 Veneman Ave.,#B240 Geo-'Phase Environmental Inc. (209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />