Laserfiche WebLink
f � i <br /> 7 GEO PHASE <br /> 0-a ENVIRONMENTAL <br /> February 17, 2010. RECOVED <br /> GPE Project No.:102.3 <br /> F1 13.2 2 2Q1Q <br /> Mr:Reed Rosenberg ENVIRONMENT HEALTH <br /> Bank of Stockton RERI4 IT(SERVICES <br /> PO Box 1110 <br /> Stockton, CA.95201 <br /> Re: Report: Quarterly Groundwater Monitoring, Fourth.Quarter 2009 <br /> Cutter Lumber Site/Western Lift(USTCFP Claim No. 01878) <br /> CWRCB GID Code T0607700498 <br /> 3930 S. El Dorado,.Stockton, CA <br /> Dear Mr. Rosenberg: <br /> Pursuant to a recent regulatory directive, no groundwater sampling was <br /> conducted at the subject site during this quarter, <br /> The SVE/AS remedial system was operated during much of the quarter, and <br /> monitoring data sheets are herein attached. It was shut down on the 9th of <br /> October for scheduled.subsurface re-equilibration and restarted on the 9th of <br /> November. It ran for.the remainder of November and was once. again shut <br /> down on December 8•for re-equilibration. <br /> Respectfully Submitted, <br /> Geo-Phase Environmental Inc. <br /> Stephen M. Lankford, PG/REA <br /> CC: San Joaquin._County EHD <br /> Attachment <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. (209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />