Laserfiche WebLink
1 Within 48 hours of well installation after well sealing materials have had time to set,each <br /> monitoring well will be developed by mechanical surging and pumping until a clear stream is <br /> obtained. All down hole equipment will be decontaminated before and between uses. <br /> Development water will be removed from the well using either a bailer or a submersible pump and <br /> containerized in D.O.T.approved drums(labeled contents under analysis)to await proper <br /> disposition. After development the wells will be allowed to stabilize for 48 hours before they are <br /> ' purged and sampled <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br />