Laserfiche WebLink
TABLE 3 <br /> ANALYTICAL RESULTS of WATER SAMPLES <br /> JU1;1 <br /> February 9, 1994 <br /> TPH as TPH as Ethyl- <br /> Sample ID Gasoline Diesel Benzene Toluene benzene Xylene <br /> MW-112-9-94 140 ND 7.0 ND ND ND <br /> ' MW-412-9-94 ND ND 1.7 ND ND ND <br /> MW-512-9-94 ND ND ND ND ND ND <br /> :7]1 <br /> µg/L = parts per billion (ppb) <br /> ND = None Detected <br /> 5.0 CONCLUSIONS & RECOMMENDATIONS <br /> 5.1 Groundwater Contamination <br /> ' Very low concentrations of petroleum hydrocarbons continue to be detected in the two <br /> monitoring wells located directly down gradient of the excavation. Both the extent and the <br /> magnitude of the dissolved gasoline plume appear to be relatively minor and easily <br /> mitigated. At least two options for interim groundwater remediation are available: an <br /> extended purge (perhaps 500 gallons) of MW-1 and MW-4, and an air-sparging pilot test <br /> ' to flood the aquifer with oxygen and enhance hydrocarbon oxidation. GeoAudit recommends <br /> a meeting with the PHS/EHD to discuss these and other alternatives for groundwater <br /> treatment. <br /> 5.2 Soil Contamination <br /> As noted in previous reports, minor concentrations of toluene, ethylbenzene, and xylene <br /> were detected in three soil samples from MW-1 when the well was drilled in 1992. Before <br /> granting site closure, the PHS/EHD will probably request that this contamination be <br /> ' addressed in some way. Although this contamination is probably not extensive, neither the <br /> volume of residual contaminated soil nor the average concentrations of hydrocarbons can <br /> be estimated with the available data. GeoAudit recommends that a soil boring be drilled <br /> ' near MW-1 to determine whether contamination is still present or has remediated naturally. <br /> If contamination is detected, one or two additional borings should be adequate to fully <br /> delineate its extent. Depending on the volume of soil and the average concentration of <br /> contaminants, a plan to either remediate the contamination or justify leaving it in place can <br /> be developed. <br /> Worc+e lih QR,S/1-py-1.10 <br />