Laserfiche WebLink
Phase I Excavation and Sampling <br /> A/C <br /> t \ Soil Piles(Clean) <br /> WL-4(15) Chain link fence <br /> ft-----��-- WL-1(25')• •WL-3(29') <br /> Excavation <br /> WL-2(2 )' <br /> Soil Piles I <br /> 1 <br /> 1 <br /> WAREHOUSE BAY <br /> Scale <br /> t_ ,^ io <br /> feel <br /> N <br /> FIGURE 2 - SITE PLAN Project No. <br /> CV45-49C5-1.10 <br /> Geological Audit Services, Inc. Western Lift <br /> Yorba Linda• Stockton 3430 S. EI Dorado Street Revised <br /> Stockton, California 11 November 1991 <br />