Laserfiche WebLink
Borehole Log <br /> Project Name Bank of Stockton Borehole No B-5 Page i of 1 <br />' Project No 443 3 Date June 25, 1996 Contractor GTI <br /> Area & County El Dorado / S Joaquin Drilling Method Hand Auger <br /> 1 Field Geologist S Lankford Elevation at Measuring Point <br /> I Tot Dep— 10' Csg Dep Annular Seal Filter Pack _NIA Grout 10' to surface <br /> 1 ' <br /> Borehole Dia 3 5" Csg Dia Screened Interval Slot Size Water Level N/A <br /> U <br /> z IU � i G ✓] <br /> p c� 3 ° � Description Remarks <br /> 1 <br /> 0-15"Road Base <br /> I <br /> I <br /> f5' I <br /> fill material misture of native soil,non-native soil <br /> I and debris Includes wood fragments,nails,etc no odor <br /> N� <br /> 110' 1 —^ silt,clayey,darks rav, 2 5Y1/4 stiff <br /> B5-101 1625 NIA I CL g �' <br /> I ® strong gasoline odor gasoline odor <br /> 15' s <br /> 1 120it' <br /> 11 <br /> i I <br /> I <br /> I <br /> i I <br /> ' Notes I it <br /> I, <br /> I i <br /> 1 <br />