Laserfiche WebLink
I <br /> C San Joaquin County <br /> OPa'u�N c nviwronmental Health Department DIRECTOR <br /> E <br /> _��'•,O Donna Heran,REHS <br /> z 1868 East Hazelton Avenue <br /> N: PROGRAM COORDINATORS <br /> } .: Stockton, California 95205-6232 <br /> , Robert Mccleuon, RENS <br /> Jeff Carruesco,REHS, RDI <br /> Cq •.." ., P Website:www.sjgov.org/ehd r Kasey Foley, REHS <br /> L F o Ra Linda Turkatte,REHS <br /> Phone: (209)468-3420 Rodney Estrada,REHS <br /> Pax: (209)464-0138 Adrienne Ellsaesser,REHS <br /> August 26, 2013. <br /> BANK O:F STOCKTON <br /> ATTN: REED ROSENBERG <br /> P O BOX 1110 <br /> STOCKTON, CA 95201 <br /> Subject: FORMER WESTERN LIFT/CUTTER LUMBER SITE CODE: 2053 <br /> 3430 S EI Dorado <br /> Stockton, CA 95206 <br /> WORK PLAN: Groundwater Monitoring and Service Well Abandonment <br /> DATED: August 9, 2013 <br /> PREPARED BY: GeoPhase Environmental <br /> APPROVED: X <br /> DISAPPROVED: [ <br /> ADDENDURMEEDED: L Submit by:- <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10 (c)(3)]: <br /> 1. To destroy 16 on-site wells associated with the LOP/UST investigation and remediation. <br /> 2. To over-bore 13 wells (MW-6, MW-7, MW-8B, VEW1 through VEW-6, and ASW-1 <br /> through ASW-4) to total depth and plug the borings from the bottom to surface with neat <br /> cement. <br /> 3. To pressure grout 3 wells (MW-9 through MW-11) using neat cement from total depth to <br /> 2.5 feet from surface. A one foot mushroom cap will be placed around the top of the . <br /> well casing from 3 feet to 2 feet in an excavation 12 inches larger in diameter than the <br /> original boring use for well construction. <br /> COMMENTS AND CONDITIONS: <br /> 1. A well destruction permit application with fee must be submitted and_a permit secured from <br /> the EHD prior to being field work. <br /> 2. A public notice fact sheet must be submitted to the SJCEHD, .the CVRWQCB, and <br /> uploaded to GeoTracker within 60 days of this WP approval. <br /> 3. A 60-day public comment period prior to site closure is required before moving forward with <br /> any well destruction activities. If no comments are received during the 60-day period, the <br /> well (destruction process can process. <br /> DATED BY Al <br /> —, <br /> Harlin Knoll, Senior REHS (209) 468-3442 <br /> CC.: Tony Palma, 3922 EI Dorado LLC,10 Rickenbacker Circle, Livermore, CA 94551 <br /> Steve Lankford, GeoPhase Environmental, 2937 Veneman, B240, Modesto, CA 95356 <br />