My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:29:12 PM
Creation date
7/30/2019 1:44:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> o• e <br /> Unit Supervisors <br /> ar ; ;'i. Donna K Hera',R.E.H.S. <br /> WT, Directdr 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> ..., <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> :»_ �a• Program Manager Douglas W.Wilson,R.E.H.S. <br /> a�pFQ. �a Laurie A.Cotulla,R.E.H.S. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> DAN SMITH <br /> MANNA PRO CORPORATION <br /> 707 SPIRIT 40 PARK DRIVE, SUITE 150 <br /> ST. LOUIS MO 63005 <br /> RE: 4004 S.El Dorado Site Code: 1088 <br /> Stockton, Ca. 95206 <br /> WORK PLAN: CAP Addendum <br /> DATED: Aug. 12,2002 <br /> PREPARED BY: Geo-Phase Environmental <br /> APPROVED: <br /> DISAPPROVED: <br /> ADDENDUM NEEDED: Submit b <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25299.37,subd(c)(3)]: <br /> 1. Drill and install 10 vapor extraction wells and 8 are sparge wells to remediate soil and groundwater. <br /> 2. Develop air sparge wells if obstructed by solids at time of installation. I <br /> 3. Install conveyance piping,extraction blower, sparge compressor, and carbon treatment system. <br /> 4. Operated remediation system and report system contaminant removal progress to MD and <br /> CVRWQCB, t <br /> 5. Continue Quarterly Groundwater Monitoring and reporting until site cleanup'is completed and closure <br /> with no fur her action is granted. <br /> CON TENTS AND CONDITIONS: <br /> 1. Obtain EHD permits for well installations. <br /> 2. Obtain SWRCB/Cleanup Fund preapproval or all cost associated with this phase of proposed work. <br /> 3_ Continue with Quarter Monitonng and reporting. <br /> 0 / OLS <br /> DATED <br /> 4 BY <br /> Harlin KnollSenior REH 209 468-3442 <br /> Cc: Tony Palma-Palma LLC <br /> Geb-Phase <br /> I r ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.