My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:29:12 PM
Creation date
7/30/2019 1:44:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%too lwll� <br /> .r <br /> v <br /> _2_ February 18, 2000 <br /> Manna Pro Corporation <br /> Task Amount Pre-Approved Comments <br /> S eciai lab analysis $1485 <br /> Pilots stem instaliation/o eration $2801 <br /> Pilot system $6185 <br /> monitorin maintenance <br /> 2uarerly groundwater $8154 <br /> onitorin well develo mcnt <br /> Groundwater monitoring sample $6798 <br /> analysis <br /> 4 quarters of monitoring report $1960 $490/report <br /> Waste disposal $2860 <br /> Pilot test results report $1120 <br /> Feasibility stud re ort $1540 <br /> Pro'ect management $850 <br /> Al <br /> TOTAL PRE-APPROVED $64,854 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs on the <br /> new scope of work. <br /> • Although I have referred to the Geo-phase Environmental proposal in my pre-approval above,please <br /> be aware that you will be entering into a private contract: the State of California cannot compel you <br /> to sign any specific contract. This letter pre-approves the costs as presented in the proposal dated <br /> January 11, 2000 by Geo-phase Environmental for conducting the work approved by the: County for <br /> implementing the August 16, 1999 Geo-phase Environmental workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, or a bid <br /> waiver from Fund staff, from qualified firms for all necessary corrective action work. The legislation <br /> governing the Fund requires that the Fund assist you in procuring contractor and consultant services for <br /> corrective action. If you need assistance in contracting for corrective action services,don't hesitate to call <br /> me. <br /> California En vironmental Protection Agency <br /> Zj' Reeyekd Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.