Laserfiche WebLink
AZURE ENVIRONMENTAL <br /> �. 3.0 SCHEDULE <br /> Upon receiving approval of this Workplan from the SJCPHS, it is estimated that the total time to <br /> complete the tasks of the. proposed Scope of Work is 6 to 8 weeks. Task I will be completed <br /> within about 2 to 4 weeks of receiving the SJCPHS approval, assuming a normal two-week <br /> laboratory turnaround time for sample analysis. A technical report of the results of the further <br /> investigations (Task 2) can be prepared within four weeks of Azure's receipt of laboratory data. <br /> We plan to implement this Workplan following your concurrence with the proposed scope of <br /> work described above. Please feel free to call me at 41.51485-9740 if you have any questiorns. <br /> Sincerely, <br /> , <br /> Jeff Hennier, R.G. <br /> Principal Hydrogeologist <br /> cc: Larry Chapman, Manna Pro <br /> George von Stamwitz, Esq <br /> 3 <br />