Laserfiche WebLink
❑❑� GROUNDWATER <br /> EILIITECHNOLOGY, INC. 4057 Port Chicago Highway,Concord,CA 94520(415)671-2387 <br /> FAX:(415)685-9148 <br /> November 20, 1992 <br /> Project No. 020502819 <br /> Mr. Steve Schneider <br /> San Joaquin County Public Health Services NOV 2 31992 <br /> 445 N. San Joaquin Street <br /> Stockton, CA 95201 <br /> ENVIRONMENTAL HEALTH <br /> RE: Manna Pro Facility PERMIUSERVICES <br /> 4004 S. EI Dorado <br /> Stockton, Callfomla <br /> Dear Mr. Schneider: <br /> This letter serves to notify San Joaquin County Public Health Services (SJCPHS) of Manna Pro <br /> Corporation's intent to Implement selected tasks outlined in the Work Plan for Characterization a <br /> Rem tin of Stockpiled Solis Tank Pit Ex vats n Backfilling, dated July 30. 1992. Based <br /> upon the meeting between SJCPHS and the Regional Board (RWQCB) on November 3, 1952, we <br /> understand that the RWQCB will not approve of backfilling the tank pit with the excavated solls until <br /> they have reviewed the results of soil pile characterization sampling. For this reason we plan to <br /> proceed with Task 1 of the work plan, which is soil pile sampling and analyses. Upon receipt of <br /> laboratory analyses results, a brief letter report will be provided to SJCPHS and RWQCB for review <br /> by December 31, 1992. The letter report will include our recommendations regarding what to do <br /> with the stockpiled soil. This is consistent with the November 16, 1992 letter from your office to <br /> Manna Pro. <br /> In addition, Manna Pro would like to begin the process of tank pit backfilling, by placement of <br /> approximately 1,200 cubic yards of fill material stockpiled on site from unrelated construction <br /> activities. The backfilling will be performed as described in the work plan. <br /> Manna Pro would like to begin these tasks as soon as possible. Once the subcontractors can be <br /> scheduled, we will notify SJCPHS and RWQCB regarding the date(s) of field work. We anticipate <br /> that the soil sampling will be performed the week of December 7, 1992. <br /> If you have any questions or comments, please call either Mr. Dean Willis of O'Meiveney Myers at <br /> (213) 669-6000, or me at (510) 671-2387. <br /> Sincerely, <br /> GROUND gWAT :,OGY, INC. <br /> Richard Hydroge <br /> Project Manager <br /> cc: E. Thayer, California Regional Water Quality Control Board - Central Valley Region <br /> Offices throughout the U.S.,Canada and Overseas <br />