My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:03:41 PM
Creation date
7/30/2019 1:45:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AZURE ENVIRONMENTAL <br /> Ground-water elevation data will be collected from all Site monitoring wells on a quarterly <br /> schedule. Ground-water sampling data are recommended to be collected from Site monitoring <br /> wells on a quarterly, semiannual and annual schedule (Table 1). Quarterly samples will be <br /> collected from downgradient wells MW-9 and MW-10 (Figure 1). Semiannual sampling is <br /> recommended for near-source wells (MW-1, MW-3 and MW-G) and crosseradient wells (MW-5, <br /> MW-7 and MW-8). Upgradient well MW-2 is recommended to be sampled annually, while <br /> upgradient well MW-4 is recommended to be removed from the sampling program. Ground- <br /> water samples will be submitted to the laboratory for analysis of TPH as gasoline (EPA Method <br /> 8015/5030) and BTEX (EPA Method 8020). Per your request, first and second quarter samples <br /> from wells MW-9 and MW-10 will be sampled for methyl tert-butyl ether (MTBE). In the event <br /> that MTBE is not detected, no additional MTBE analysis will be performed. <br /> The monitoring data will be presented and evaluated in quarterly reports prepared in <br /> accordance with the SJCPHS guidelines. Quarterly monitoring reports will be submitted to <br /> the SJCPHS within 30 days after the last day of each calendar quarter and will include the <br /> following: <br /> • descriptions of the methodologies used to collect and analyze the data; <br /> • tabular and figure presentations of ground-water elevation data collected from the wells; <br /> and <br /> • presentation and interpretation of ground-water analytical results, including a table <br /> summarizing historical results of ground-water sampling at the Site. <br /> We plan to implement the revised ground-water monitoring program following your concurrence <br /> with the schedule presented above. Please feel free to call me at 415/485-9740 if you have any <br /> questions. <br /> Sincerely, <br /> 1 ,1� <br /> Jeff Hennier, R.G. <br /> Principal Hydrogeologist <br /> cc: Larry Chapman, Manna Pro <br /> George von Stamwitz, Esq. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.