Laserfiche WebLink
- - - - - - - - - - - - - - - i. - - - - - - - - - -- -` - - - - - - - - - - - - - - - <br /> r a 1 510 685 914& - - - GROUNDWATER TECH 16--,6/92 15:16 004 <br /> Mr. Steve Schneider <br /> SJCPHS <br /> October 8, 1992 <br /> Page 3 <br /> li) After the excavation has been filled to 10 feet below grade as provided above, soil from the <br /> stockpile meeting target criteria may be placed into the excavation to complete the backfilling <br /> process. Manna Pro will endeavor to place soils represented by composite samples with the <br /> lowest concentratlony near the bottom of the excavation, <br /> iii) Because of the use of clean fill In the bottom of the excavation, all of the excavated <br /> soils will probably not be able to be placed back In the excavation. Therefore, soil <br /> meeting target criteria for which there Is no room in the excavation, will be spread out <br /> either on the vacant lot at the southern end of the property or on vacant land at the <br /> northern end of the property near the area designated for the on-site soil treatment. <br /> Manna Pro understands that these soils will be considered non-hazardous, will not be <br /> subject to further treatment or other requirements, and neither SJCPHS nor RWQCB will <br /> take further action with respect to them. <br /> Additionally, It is understood that if this plan is approved, future excavatlon of impacted In-place soils will <br /> not be required by SJCPHS or RWQCB as part of overall site remedlation. Manna Pro requests this <br /> assurance because the acttvNes described in this plan would not be cost-effective If future excavation of <br /> in-place soils is required. Manna Pro plans to perform in-situ remedial measures for the Impacted in- <br /> place soils. <br /> Manna Pro assumes that approval of this addendum and the associated work plan constitutes all of the <br /> permission necessary to perform the described activities. <br /> We hope these clarifications and revisions will satisfy SJCPHS and AWACS. Manna Pro would like to <br /> begin this project as soon as possible to take advantage of the weather, and have the excavation <br /> backfilled before the rainy season begins. If you have any questions or comments, please call either <br /> Dean Willis of Q'Melveney & Myers at (213) 669.6000 or me at (510) 671-2387. <br /> Sincerely, <br /> GROUNDWA NOI.OGY, INC. <br /> Richard M. masser <br /> Hydrogeologist anager <br /> cc: Ms. Elizabeth Thayer, RWQCB Central Valley Region <br /> Mr. bean Willis, 4'Melveney& Myers <br /> Mr. Larry Chapman, Manna Pro <br /> MPWPA002 <br /> _ cRouNnWATER <br /> I i� <br /> 1 TrcmN LocY.I1rc. <br />