Laserfiche WebLink
N ' <br />:Y <br /> wuFDrwrvmrental colLS1lUantS, Inc. <br /> Health do Safely Plan <br /> Page: 3 <br /> 2.4 SAFEMUPLEMEWATION <br /> r, <br /> The provisions of the WHF Environmental Consultants, Inc. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to <br /> determine whether specific amendments are to be made to the Health and Safety Plan <br /> based on specific characteristics which may exist on the job site. Any suspected <br /> .++ hazards associated with the on-site operation which exposure to, via inhalation or skin <br /> absorption, to such as suspected carcinogens or human sterilants, will be documented <br /> and specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices. <br /> A defined project site layout is paramount to the safe completion of all remedial site <br /> investigations. The project site layout has built-in safety features. The site is divided <br /> into three zones. The following list defines the required personnel protective <br /> equipment. <br /> 2.1 Personnel Protective Equipment(PPP) <br /> Personnel who will be worlang in or around the exclusion zone of the job site <br /> - will use the following protective equipment and measures as warrant by the <br /> a� Project Manager: <br /> - Coveralls as an undergarment <br /> Saranex outer garment <br /> Sample gloves(inner) <br /> �,� - FVC, Nitrile or Neoprene outer gloves <br /> Hard hat <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> - Full facepiece respirator with R53HE cartridges(a combination of <br /> F j organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> - Self-contained air will be utilized if project dictates <br />