My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012684
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0012684
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:17:07 PM
Creation date
7/30/2019 1:55:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012684
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
562
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> 10-X12;1��0 1� 71 A'r L� err LAYERS L.H. 213 669 sa67 p.19 <br /> KW ENYrRONMEWA.L CONSULTANTS, INC. <br /> Health do Scx}aty Pian <br /> 1.D hFALT H AND,$AMY PLAN <br /> WW Environmental Consultants, Inc. has adopted the following health and safery <br /> procedures far worlrng with organic vapors and liquid contaminant: eneounv.red <br /> during drilling and excavation of 3ubsurfacc soil. The purpose of this program is to <br /> provide health and safety precautions for the initial and subsequent site visits unto ;he <br /> nature and magnitude of the contaminants have been defined. <br /> !.! Aersonrulltr�ponlibilllier <br /> All personnel assigned or involved with the remedial investigadon or site clean. <br /> �. ups will have an assigned responsibility. The outlined responsibilities will <br /> establish standards for personnel protective wear, safety procedures and provide <br /> for emergency actions which could arise during project operations. <br /> 1.2 ftJea Mawger(PH) <br /> { The !project Manager directs ail pro ect operations. Project Manager(P44), in <br /> cooperation with the Project Safety Officer(PSO), has the primary <br /> responsibility for ensuring that the safety plan is read, signed, and fully <br /> understood by all employees and outside persons allowed aroun,i or within <br /> designated woridng perimeters of the job site. <br /> In cooperation with the PS©, he is responsible for ensuring them at all times <br /> during project operations, all employees adhere strictly to the?iealth and Safety <br /> Plan. <br /> 1.� PmjecrWe1y macer(P;SSO) <br /> The PSG shall direct and ensure that all employees comply with the Health and <br /> Safety Plan. The PSD has the primary responsibility_for:-- <br /> Assuring <br /> or:Assuring that appropriate personnel protective equipment is available and <br /> s..i <br /> property utilized by all on-site personnel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.