My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009408
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009408
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:14:46 PM
Creation date
7/30/2019 2:01:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009408
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 02, 1'�-9O 1:3 41 TTIELVENY y ,IYERS L N 213 659 7467 F 19 <br /> WHF ENVIRONMENTAL CONSULTM7SS, INC. <br /> ' Health do Wety Plan, <br /> 1.0 FILTH AND SAFETY PLAN <br /> WHF Environmental Consultants, Inc. has adopted the following health and safety <br /> ' procedures for worlang with organic vapors and liquid contantinants encountered <br /> during drilling and excavation of subsurface soil. The purpose of thn program is to <br /> ' provide hearth and safety precautions for the initial and subsequent site visits until the <br /> nature and magrutude of the contaminants have been defined. <br /> ' 1.1 Personnel Responsibildieu <br /> ' All personnel assigned or involved with the remedial investigation or site clean- <br /> ups will have an assigned responsibility. The outlined responsib1Lties will <br /> establish standards for personnel protective wear, safety procedures and provide <br /> for emergency actions which could arise during project operations. <br />' 1.2 Prgea Manager (PM) <br /> The Project Manager directs all project operations Project Manager (P.M), in <br />' cooperation with t1te Project Safety Officer (PSO), liar the primary <br /> responsibility for ensuring that the safety plan is read, signed, and fully <br /> understood by all employees and outside persons allowed around or within <br />' designated worlang perimeters of the job site. <br />' In cooperation with the PSO, he is responsible for ensuring that at all times <br /> during project operations, all employees adhere strictly to the Health and Safety <br /> Plan. <br /> 1.3 Projea Wejy Officer (PSO) <br /> The PSO shall direct and ensure that all employees compiy with the Health and <br /> Safety Plan. The PSD has the primary responsibility for - <br /> I Assuring that appropnate personnel protective equipment is available and <br /> properly utilized by all on-site personnel. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.