Laserfiche WebLink
10 -4� T MELVEMI :13 a69 7457 P 22 <br /> WHF FA►nra=ental Consuitaw. Inc. <br /> Health & Wety Plan <br /> Page: 4 <br />' More stringent protective equipment requirements will be implemented if <br /> necessary This determination will be made by the project supemsor after <br /> review of the materials to be handled, the ambient morutonng data, consultation <br />' with on-site technical personnel, the Safety Officer, $and the proper management <br /> personnel Upgrades in PPE, if ne=sary, will be implemented. <br />' Z-2 General Wety <br /> The on-site Safery Officer will be responsible for the following daily safety <br /> implementations, <br /> 2.3 Daily Welly Meenng r <br /> iEach day prior to commencing work, al safety rnaenng shall be held to discuss <br /> safety considerations for the day's work, to be done A safety topic shat' be <br /> addressed each day from the Wlowmg list. <br /> Site Safety Plan (first day and once a week thereafter) <br /> - Fire Fighting Techruques <br /> - Defensive Dnvtng <br /> Aecontaminauon <br /> - Levels of Protection <br /> Heat Stress <br /> Emergency Equipment on Site <br />' - confined Space Entry Procedure - Respirator Mrantenanct <br /> - Self-contained Breathmg Apparatus Traivng (if necessary) <br /> 2.4 Wely dog <br />' A safety log shall be kept for the project work site <br /> 2.S Eaung, Drinking, Smoking <br /> Eating, drnlang, and smoking shall be allowed only in the desigrated area in <br /> the support zone No personnel tray tit, drink, or smoke on-site in any other <br /> area except as permitted by the SSO <br /> 1 <br />