Pilot Testing Report and Conceptual Corrective Action Plan July 15, 1994 <br /> Manna Pro, 4004 South EI Dorado, Stockton, CA 4 <br /> iperformed soil sampling around the tank excavation This sampling was performed by excavating <br /> Slats into the walls of the existing excavation using a backhoe, in accordance with the Re-excavation <br /> ' Work Plan prepared by WHF that had been approved by SJCPHS <br /> t Soil samples were collected from depths of approximately 17 feet below grade (2 feet below the <br /> bottom of the excavation) and 32 to 35 feet below grade (17 to 20 feet below the bottom of the <br /> excavation) The samples were analyzed for TPH-D, TPH-G, and BTEX Most of the samples <br /> collected contained TPH-D concentrations between 2 and 10 mg/kg In general, impacted soil <br /> encountered during this investigation appeared to be limited to the northeast quadrant of the <br /> 1 excavation at a depth of approximately 33 feet below grade <br /> 2 1 5 Monitoring Wells MW-1 through MW-6 <br /> Groundwater monitoring wells MWA through MW-6 were installed by ERM-West in 1990 to evaluate <br /> the impact to shallow groundwater associated with the former USTs The details of well installation <br /> and results are discussed in the report, Soil & Groundwater Investigation at Manna Pro, Inc, Facility, <br /> dated December 1990 <br /> 2 1 6 Monitoring Wells MW-7 through MW-10 <br /> ' Additional groundwater monitoring wells were requested by SJCPHS to complete definition of the <br /> extent of contamination Four new monitoring wells (MW-7 through MW-10) were installed in <br /> ' January, 1993 by Groundwater Technology, Inc , the consultant that replaced ERM-West The <br /> details of well installation and results of sampling are discussed in the Quarterly Report of <br /> Groundwater Monitoring and Sampling, dated April 15, 1993 <br /> 22 Summary of Recent Investigation and Pilot Testing <br /> To conduct corrective action pilot test activities, Groundwater Technology installed one extraction <br /> ' well and three observation wells on site Because the data gathered during these activities have not <br /> been included in a previous report, details on drilling, sod sampling and well construction are <br /> provided in the following sections Before drilling, a permit to install one extraction well and three <br /> observation wells was obtained from the SJCPHS <br />' zaysRvaa 070 <br /> GROUNDWATER <br />' TECHNOLOGY, INC <br />