Corrective Action Plan Page 18 <br /> Former Manna Pro Site <br /> Project No 207 3 <br /> February 16,2001 <br />' 6.0 REPORTING <br />' Reports will be submitted upon completion of various aspects of remedial systems <br /> installation and operation <br />' 6.1 Report of System Installation <br />' First Phase <br /> A report documenting the installation and operation of the interim remedial system will <br /> be submitted after the system has been in operation for three months This will include <br />' compilation and evaluation of remedial activities to date as well as recommendations for <br /> the location and construction of components of the expanded remedial system <br />' Second Phase <br /> A report documenting the installation and operation of the interim remedial system will <br /> be submitted upon its installation and initial operation This report will include <br /> I information from the installation of the air sparge and vapor extraction wells as well as a <br /> discussion of initial remedial data A second report will be submitted upon completion of <br /> one year of remedial operation This will include compilation and evaluation of remedial <br /> activities to date as well as recommendations for future work needed (if any) <br />' 6.2 Quarterly Monitoring <br /> A section of the report will be document the quarterly monitoring event based upon <br />' information collected during the next groundwater monitoring event Future groundwater <br /> monitoring events will be completed as described in Sections 4 3 3 Upon completion of <br /> each event, a quarterly groundwater monitoring report will be completed This report will <br />' also include remedial data collected during the same quarter and a discussion of both <br /> groundwater and remedial data <br /> 1 <br />' 2937 Veneman Ave ,##B240 Geo-Phase Environmental Inc Phone(209) 569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br /> 1 <br />