Laserfiche WebLink
4. Tank cross-sectional diagram included on blueprints. �� r <br /> 5. Detail of tank, piping system, excavation and cover. j� I <br /> 6. Tank(s) and piping approved by a nationally recognized independent testing <br /> organization. [Title 23, Subchapter 16, Article 3, Sec. 2631 (r) & 2635] <br /> 7. Verification of product compatibility with the tank(s), piping, monitoring <br /> ` device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> S. Manufacturer's written installation instructions for tank(s), piping, monitoring <br /> devices, etc. [Section 2635 (b) (5)] <br /> 9. Tightness Test (NFPA 30) is required on both primary (10) and secondary <br /> (2°) containment systems before covering. [Section 2635 (b) (6) & (7)] <br /> 10. Double walled tanks using pressure or vacuum testing to monitor the annular <br /> space. [Section 2635 (b) (7)] <br /> 11. NFPA 329 "Precision Test" required upon completion of installation with tank <br /> in operating condition. Test results to be submitted directly to PHS/EHD <br /> from the testing company or owner of facility. [Health & Safzty Code, <br /> Division 20, Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> # # -- # # # <br /> CAPACITY7000 <br /> V1�e, �e 0 5 <br /> (_ 0ins <br /> ;e <br /> MANUFACFURER Orr° w far � A ,rov! <br /> COMPOSITION SfraLsit cL Sk&L <br /> 4A 5'6­t 144-5 'Pe""ApergZAK <br /> MODEL A I 4-1 4- 11 �4 - l <br /> PRODUCT n11d All <br /> CORROSION F loev C145 '! b r�'� F4er0l+s< <br /> PROTECTION <br /> U.L. LISTED 14 L S e44 S8 <br /> COMPATIBILITY <br /> WITH 100010 160 7P /00 70 loo �74 <br /> METHANOL <br /> l <br /> 'd- <br />