My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
INSTALL 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:51:14 PM
Creation date
7/30/2019 2:41:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> 20. Secondary container(s) thickness, density, composition, product compatibility. <br /> Sized to contain unauthorized releases from primary containers to allow <br /> sufficient time for detection and removal. [Section 2631 (c)] <br /> 21. V Secondary container(s) volumetric requirements: [Section 2631 (e) (1) <br /> and (2)] <br /> A. Single 'maty containers = 100%. - <br /> B. Multiple p containers = 150% of largest primary <br /> container or 10 aggregate. <br /> 22. Secondary containe open to rainfall. [ Section 2631 (f)] <br /> Volumetric requirem s = 24 hours of 100 year storm in addition to <br /> primary container volum <br /> 23. Secondary container floor. [Section 2631 (i)] <br /> A. Constructed on firm base. <br /> B. Sloped to collection sump ( 1/8 inch per foot). <br /> (1) One or more access casings installed in sump. <br /> (a) Size to allow removal of collected liquid. <br /> (b) Extended to ground surface. <br /> (c) Covered with a locked waterproof cap or <br /> within a secured facility. <br /> (d) Thickness allows for anticipated stresses. <br /> (e) Construction materials are not weakened <br /> stored product or will not donate, capture, <br /> or mask constituents to be monitored. <br /> 24. Membrane line 'fications. [Section 2631; k,l, and m] <br />
The URL can be used to link to this page
Your browser does not support the video tag.