My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
INSTALL 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:51:14 PM
Creation date
7/30/2019 2:41:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST iNSTALLATION RECORD I n� T A4 <br /> ' <br /> FACILITY NAME Vdiole' V <br /> FACILITY ADDRESS COIR Iy M bLaroac r / Id) l V e ) <br /> SWEEPS # v TANK# 1 U.L. # j 1 PRODUCT <br /> DATE APPROVED DISAPPROVED RENS ITEM OR EQUIPMENT INSPECTED <br /> �q I2 I 1. UST INSTALLATION PLANS SUBMITTED & FEES PAID <br /> 2. UST INSTALLATION PLANS APPROVED <br /> INITIAL INSPECTION <br /> 1. HOLIDAY TEST (PLASTEEL) <br /> 2. AIR TESTED @ 5 PSI (FRP) <br /> l3 / 3. VISUAL INSPECTION OF 20 CONTAINMENT <br /> 4. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br /> PIPING STAGE INSPECTION <br /> V <br /> 0��j 1. PRESSURE TEST [1 AND 2 (NFPA 30)] <br /> f v_r 2. BALL FLOAT VALVES INSTALLED / <br /> Y V+ 3. OVERFILL PROTECTION INSTALLED, DESCRIBE: qr� OYY�¢C-O <br /> 4. UNUSED TANK OPENING SEALED & CATHODICALLY PROTECTED <br /> S. VISUAL INSPECTION OF 20 CONTAINMENT ON PIPING <br /> 'I 6. MONITORING PORTS IN PLACE & BROUGHT TO GRADE (LOCKABL.E <br /> iv J A WEATHER PROOF COVERS) <br /> 7. FILL &VENT PIPING BROUGHT TO GRADE <br /> 8. PRODUCT LINE LEAK DETECTOR INPLACE (HARD WIRED) <br /> 9. APPROVED UST LEAK MONITORING DEVICE INSTALLED W'A oA"i5. <br /> 10. ALL GALVANIZED PIPING & FITTINGS PROPERLY WRAPPED( <br /> 11. PRESSURE DECAY TEST ON COMPLETE UST & PRODUCT DELIVERY <br /> SYSTEM <br /> FINAL INSPECTION <br /> 11 1. PRECISION TEST SUCCESSFULLY COMPLETED AND HARD COPIES <br /> 1, V <br /> RECEIVED (NEPA 329) <br /> 2. SPILL PROTECTION AT FILL PIPE <br /> 3. PERFORIviANCE TEST OF OVERFILL PROTECTION SYSTEM <br /> 4. PERFORMANCE TEST OF PRODUCT LINE LEAK DETECTOR (HARD <br /> WIRED) <br /> /Zq1#1 / 5. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM(S) ON <br /> �� V TANK(S) <br /> I G�2 ✓ 6. PERMIT TO OPERATE APPLICATION COMPLETE <br /> 7. ACCEPTABLE RECORD KEEPING SYSTEM <br /> Eli 23 006 (R.EV 4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.