Laserfiche WebLink
f Z <br /> INSTALLATION PLAN <br /> 1) The installation plan has not been completed. Page 4 , item #12 <br /> and Page 9, item 25 need to be filled in. <br /> 2) You need to submit DETAILED drawings of the tank, piping, sump, <br /> final slope of the tank, dispenser, etc. Included in these <br /> drawings must be cross sectional diagrams as well. <br /> 3) Supply a list of all equipment/materials to be used by product <br /> name and model number. <br /> 4) Submit a site map that includes the location of all equipment. <br /> 5) Submit a monitoring and a response plan. Refer to section 2634 <br /> of the UST regulations for guidance. <br /> If you have any questions regarding this memo contact me at <br /> (209) 468-3468 . <br /> pe�A" 7z/�Z�W <br /> Pam Violett <br />