Laserfiche WebLink
c.Make sure fusible Yes No- N/A <br /> element Is in place <br /> and ca"GUY <br /> itioned. <br /> d.Be sum test ports s No' NIA <br /> are sealed with plug <br /> after testing is <br /> complete and no <br /> temporary rest fixture <br /> or component remains <br /> connected to valve. No' NIA <br /> 5.31nterstibal Cluck condition of <br /> leak detection equipment,including: <br /> equipment . The wlndowis <br /> clean and clear in <br /> sight leak gauges. <br /> . The wire <br /> connections of <br /> electronic gauges <br /> for tightness and - <br /> coaosicn <br /> . Activate the test <br /> button,if :I <br /> a icable. <br /> 5A Spill a.If corrosion, Yes' No NI <br /> containment damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability of the unit to <br /> perform spill <br /> containmentfunctions, <br /> re lace the unit. <br /> b,inspect the Y No NIA <br /> connections to the <br /> AST for lightness,as <br /> well as the bolts, <br /> nus,washers for <br /> condition and replace <br /> if necessa . <br /> c.Drain valves must Yes' No <br /> be operable and <br /> closed <br /> 5.5 Strainer a.Check that the Yes No- <br /> strainer is clean and in <br /> and condition.AST <br /> - <br /> SEPTEMBER 2014 <br /> CO INSPECTION STANDARD <br /> COPYRIGHT®2011 Steel Tank Institute -. . -- <br />