Laserfiche WebLink
STI SP001 Portable Container Monthly inspection Checklist <br /> General Inspection lnfortnatiorr. <br /> Uapectwn Data: 5� -7 —H pawn Until Date. (3a months fmm sapeninn date) <br /> Prior lnspeadon Date: 1.—'co— Inspetlor Name: — <br /> Conteinerslnapenled(ID ft): <br /> Inspection Guidance: <br /> ➢ For equipment not included in this Standard,follow the manufacturer recommended fnspoctioNtesting schedules and procedures. <br /> n The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual Inspection does not require a Certified <br /> Inspector.It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> D (')designates an item in a non-conformance status.This indicates that action is.required to address a problem. <br /> r Nonconforming items InRRorntanatito tank or containment intensity require evaluation by an ongireer experienced m AST design,a certified Inspector,or a tank <br /> manufacturer who will determine thecorrective action.Note the nonconformance and conesponding corrective action In the comment section. <br /> ➢ Retain the completed checklists for 35 months. <br /> Ham Area; r0.. Area: Area; im <br /> i.e AST Contatnmem)Btore aA1.1 ASTswithindesignated Y No` Yes No' Yes Na`sto a areal1,2 Debris,spills, or other fire Ye NoYes" No Yes` No hazards in containment <br /> or sm areal1.3 Water in outdoor Yes` No Yes` No seconda containment?14 Drain vskes operable Ye No` Yes` No Yes` No and in a closed <br /> 'than?1.5 Egress pathways clear Ye No' Ys" No YesNo <br /> and gatesldoors <br /> —operable? <br /> AST IN iECTION STANDARD 14 SEPTEMBERMI <br /> COPYRIGHT®2011 Steel Tank Institute <br />