Laserfiche WebLink
I <br /> 3.0 TankE uiment <br /> 3.1 Valves a.Check for leakS. Yee No <br /> b,Tank drain valvas Yes` No <br /> must be Re t locked. NIA <br /> 3.2 Spill a.Inspect for debris, a No NIA <br /> containment residue,and water <br /> boxes On fill in the box and <br /> pipe remove. No NIA <br /> b.Drain valves must <br /> be operable and <br /> closed. - <br /> 3.3 Uquiit level a.Both visual and a No` NIA <br /> equipment mechanical devices <br /> must be inspected <br /> for physical <br /> deme e. <br /> b. Check that the Yes No' A <br /> device is easily <br /> readable <br /> 3.4 Overfill e.Ifequippsd vdth a Yes No` N1 <br /> equipment "test billion, <br /> activate the audible <br /> hom or light to <br /> confirm Operation. <br /> This could be <br /> battery powered. <br /> Replace the battery <br /> if needed <br /> b. If overfill valve is Yes No' NIA <br /> equipped with a <br /> mechanical test <br /> mechanism,actuate A Y <br /> the mechanism to 1�-'v-p NQ- <br /> confirm o ration. <br /> 3.5 piping Check for leaks. Yes No <br /> conneclions corrosion and <br /> dame <br /> 4.0 Tank AttachmentsandA urtenances Ye No` <br /> 4.1 Ladder and Secure with no sign fA <br /> platform of severe corrosion <br /> sWcture adame e4 <br /> S0 Other Conaluons <br /> 5.1 Are there other conddion.that should Yes' No <br /> be addressed for continued safe <br /> operation Or hat may affect the site spill <br /> revention ltan7 <br /> SEPTEMBER 2011 <br /> AST INSPECTION STANDARD <br /> $ <br /> COPYRIGHT®2011 Steel Tank Institute <br />