Laserfiche WebLink
c.Make sure fusible Ye No` WA <br /> element is in place <br /> and corsetry <br /> osihoned. <br /> d.Be sure test ports Yes No` NIA <br /> are sealed with plug <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve. <br /> 5.3lnterstiiial Check condition of Y No" NIA <br /> leak detection equipment including'. <br /> equipment The window is <br /> clean and clear in <br /> sight leak gauges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button,if <br /> a licable. <br /> 5.4 Spill a.If corrosion, Yes' No N/ <br /> CDMainmenl damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability of the unit to <br /> perform spill <br /> containment functions, <br /> re lace the unit <br /> b.InspeQ the Yes No WA <br /> connections to the <br /> AST for lightness,as <br /> well as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> if necessa . <br /> c.Drain valves must yes` No Ni <br /> be operable and <br /> closed <br /> 5.5 Shainer a.Check that fine as No` NI <br /> stainer is clean and in <br /> Doli condition. - <br /> 11 . <br /> AST INSPECTION STANDARD SEPTEMBER2011 <br /> COPVRIGHT@2011 Steel Tank Institute - <br />