Laserfiche WebLink
. . ........... <br /> STI SP001 Portable Container Monthly Inspection Checklist <br /> General Inspection Information: <br /> F <br /> roan Date: y � A it—1 Retain Until Date: (36 months from Inspection daie) <br /> nspedion Date: � �Z� �'QInSpecWr Name: <br /> ners Inspetletl(ID iYs): <br /> Inspection Guidance: <br /> ➢ For equipment not Indoded in this Stallard,follow the manufacturerrecommended inspectionitesting schedules and procedures. <br /> D The periodic AST Inspection Is intended for monitoring the external AST condition and its canlalnmenfstructure.This visual Inspection does not require a Certified <br /> Inspector.It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> > (-)designates an item in a non-conformance status.This indicates that action is required to address a:problem. <br /> > Non-conforming itemsimportant ttanker conta'nmentintagiity require evaluation by an engineer experienced in AST design,.a Garbed inspector,or a tank <br /> manufacturer who will determine the corrective notion.Note the nonlonforni and conespohding corrective action In the comment section. <br /> > Retain the completed checklists for 36 months. <br /> Hem Area: Area: <br /> Area: Areal <br /> 1.0 AST ContainmemYStora eAre <br /> 1.1 ASTs within designated Ye No` yes No' Yes No` Yes No' <br /> store a area? —NoYes" No <br /> 1.2 Debris,spills,or other fire as No Yes' No Ves' <br /> hazards in containment <br /> Drain. area? <br /> 1.3 Water in outdoor Yes' N Yes" No Yes" No Ves" No <br /> seconds containment? <br /> 1A Drein valves Operable es No" Yes' No Yes` No Ves" No <br /> and in a closed <br /> ostlion? <br /> 1.5 Egress pathways clear Ye No` Y.* 140 Ves' No Yee' No <br /> and gates/doors <br /> operable' <br /> AST INSPECTION STANDARD 14 - SEPTEMBER 2011 <br /> COPYRIGHTD2011 Steel Tank Institute _ __. <br />