Laserfiche WebLink
u Make sure fusible Ye No' NIA <br /> element is in place <br /> and Wm ctly <br /> couched. <br /> d.Be sure test ports Y No` NIA <br /> are sealed with plug <br /> after tasting is <br /> complete and no <br /> temporary test fbdure <br /> or component remains <br /> connected to valve. <br /> 5.3 Interstitial Check mndition of Y No` NIA <br /> leak detection equipment,including: <br /> equipment • The Window is <br /> dean and clear in <br /> sight leak gauges. <br /> • The wlro <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> buticn,if <br /> a livable. <br /> 5.4 Spill a.ifcorrosion, Yea" No W <br /> containment damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability of the unit tc <br /> pe 0.spill <br /> containment functions, <br /> re lam the unit. <br /> b.Inspect the Ve " No NIA <br /> connections to the <br /> AST for lightness,as <br /> Well as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> if necessa - <br /> c.Drain valvae must Yes` No <br /> be operable and <br /> closed <br /> 5.5 Strainer a.Check that the Yes No` <br /> strainer is clean and in _ <br /> good condition. <br /> AST INSPECTION SfANDAftD �� SEPTEMBER 2011 <br /> COPYRIGHT®2011 Steel Tank Institute <br />