Laserfiche WebLink
I <br /> I <br /> STI SPO01 Monthly Inspection Checklist <br /> rGeneral action Information: moltstmmincpecton daze) <br /> n Dale: ��h Ratam Until 0aie:NsPedor Neme:n Oete:etl(l0 as): <br /> Inspection Guidance: <br /> D Forequipmentnot induced in this Standard,follow the manufacturer recommended inspectionitestng schedules and procedures. <br /> problem. <br /> D The periodic AST Inspection Is intended for monitoring the external AST condition and its an identify <br /> structure. This visual inspection does not require a Certife <br /> Inspector It shall be performed by an owner's inspector who isfamillar with the site and can identify changes and developing D <br /> D Upon dlscrovery of wader In the primary tank,secondary containment area, mtercont or spill sand this remove promptly or fake other conecfiva action.Before <br /> discharge to the environment inspect the liquid for regulated products action is <br /> to anddisposedle Itproperty. <br /> D (')designates an item in a nonconformance status.This indicates that action is required m address a problem. <br /> an enineer <br /> D Noi-cadurminger it will determine the <br /> conectve notch. n <br /> rienced in AST <br /> sign, a <br /> fied <br /> important Lo a Note the noconkce n <br /> nnand corresponde gpdamccllve action inthecomment sectionector,or a tank <br /> v Retain the completed checklists for 36 months. <br /> D ,ion, <br /> wind storms)or maintenance(coot as painting)that could effect the operation of crlUcal components <br /> In the event of severe weather(snow),an inspection of these components is required as soon qa the equipment is safely necessitate after tteevent <br /> (normal and emergency vents,valves <br /> Item Task <br /> Status Comments <br /> t.OTank Containment Yes' No <br /> 1.1 Containment Check�craorfre NIA <br /> structure debris, <br /> hazartl <br /> 1.2 Prima tank Checkfor venterI 1YV No <br /> 1.3 Containment Mel, yea N0' <br /> drain valves Gored ositon NIA, <br /> 1.4 Pathways and Clear and Yao' <br /> entry gateadoors <br /> o cable <br /> 2.0 Leek Detection Yes' 0 <br /> 2.1 Tank Visible signs of <br /> leaka e <br /> 2,2Secondary Vsible signs of Yes" No <br /> Containment leakage from tank <br /> into secondary <br /> containment Yes <br /> 2.3 Surrounding Visible signs of tti <br /> soil lea <br /> NIA <br /> 2.4 Interstice <br /> Visible signs of Yee <br /> lea e <br /> 4 SEPTEMBER 2011 <br /> AST INSPECTION STANDARD <br /> COPYRIGHT®2011 Steel Tank Institute <br />