Laserfiche WebLink
.. .......... . . <br /> . . _........ ... ...... . <br /> STI SP001 Annual Inspection Checklist I <br /> I <br /> General Ins ection Information: nr <br /> irom <br /> Retain Until Date: (38 months "cAsspection Bete) <br /> Inspection Date: / r <br /> _J.r2 Date: <br /> Prior IO nepeour Name: <br /> nspacaon � —� <br /> Talks Irspectad(ID iss): <br /> Inspection Guidance: <br /> > For equipment not Included In this Standard,follow the manufacturer recommended insPOCUOh estigt strictures and procedures. <br /> Y The periodic AST Inspection is intended for monitoring ns exempt <br /> Alar withST onNe site and can IUelndfy tvisual <br /> dition and his hstructure This anges andd developng p inspectiondoesnot require a Cenlfatl <br /> on <br /> Inspector It shall be perfu med by an owner's inspect <br /> Remove promptly upon discovery standing water or Ilquid in the primary tank,secondary Of it containment area,Interstice,or spill container. Before discharge to the <br /> rty- <br /> environment,inspect the liquid for regulated products or other contaminants and disposed of it prop must <br /> > In order b comply with EPA SPCC(Spill Prevention,Control and Countermeasure)rules,a facility must regularly test liquid level sensing devices to ensure prober <br /> operation(40 CFR 112.5(c)(S)(v)I, <br /> > I')designates an item in a non-conformance status.This indicates that action is required to address a erla em. <br /> manufacturer who will detelrnine the corn Uc ---btih Note nonuionfortnanceenire evaluation tl corian espondrtng co ectiaenced lachor inethle comment sseectionector,ora tank <br /> Y Retain the completed checklists for 36 months. <br /> -performed Inspection cherkl'nts <br /> > Complete this checklist on an annual basis supplemental to the owner monthly . <br /> > Note:N a change has occurred to the tank system or containment that may affect the SPCC plan,the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and Implementation. <br /> Item Task <br /> Status Comments <br /> 1.0 Tank Containment Yes" No N/ <br /> 1.1 Containment Check for 'D-k, w' <br /> structure • Hales or tacks in <br /> containment wall <br /> or floor <br /> • Washout <br /> • Linerdegratlation <br /> • Corrosion <br /> Leakage <br /> Paintfailure <br /> Tankeetdin <br /> 2.0 Tank Foundation and Su Orta No <br /> 2.1 Foundation Sarcoma :or <br /> 2.2 Concrete Pad Cracking or sparing? Yes' No <br /> or ring wag <br /> $ SEPTEMBER 2011 <br /> AST YRIGHON 2D11STANSRD <br /> COPYRIGHT®2011 Steel Tank Institute <br />