Laserfiche WebLink
c.Make sure fusible Y No' NIA <br /> element its in place <br /> and correctly <br /> ositioned. <br /> d.Be sure test ports s No' NIA <br /> are sealed with plug <br /> after tastng is <br /> complete and no <br /> temporary test fixture <br /> M component remains <br /> connected to valve. <br /> 5.31nten ilial Check condition of Y No' N/A <br /> leak detection equipment,including: <br /> equipment • The window is <br /> clean and clear in <br /> sbhtleak gouges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> tortighmeas and <br /> corrosion <br /> • Activate the test <br /> button,if <br /> a licable. <br /> 5.4 Spill a.If corrosion, Yes' Nd N/ <br /> containment damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability of the unit to <br /> perform spill <br /> containment functions, <br /> re lace the it. <br /> b.map act the Y No NIA <br /> connections to the <br /> AST for lightness,as <br /> well as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> if necessa . <br /> c.Drain valves no Yes' No I <br /> be operable and <br /> closed <br /> 5.5 Strainer a.Check that the Yes me <br /> strainer Is clean and in <br /> good condition. <br /> SEPTEMBER 7011 <br /> AST INSPECTION STANDARD <br /> COPYRIGHT®2071 Steel Tank Institute, <br />